Installation method
Pipe Reducing + Grooved Nipple welding + Coupling
Example) Material cost + processing cost 3,960 + 10,950=14,910won
Pipe Reducing + Grooving + Coupling
Example) Material cost + processing cost 3,960 + 7,750 = 11,710won
The only construction method in Korea that allows side branching on the same circumference
① Other fire sprinkler pipe manufacturing method (Extruded tee type, side branch)
② (Extruded tee type, upper part / Welded tee “squared c” cross pipe)
③ KAI LABS’s fire sprinkler pipe manufacturing method (Outlet - Non-expansion type)
KAI LABS CO.,LTD.
Head Office / Factory 1:
2431-23, Chinhwangyeong-ro, Geumseo-myeon, Sancheong-gun, Gyeongsangnam-do, Republic of Korea
Factory 2 :
33, Chinhwangyeong-ro 2451beon-gil, Geumseo-myeon, Sancheong-gun, Gyeongsangnam-do, Republic of Korea
Tel : +82-55-973-3119 / Fax : +82-70-7966-3119
kailabs@naver.com
Head Office / Factory 1 : 2431-23, Chinhwangyeong-ro, Geumseo-myeon, Sancheong-gun, Gyeongsangnam-do, Republic of Korea
Factory 2 : 33, Chinhwangyeong-ro 2451beon-gil, Geumseo-myeon, Sancheong-gun, Gyeongsangnam-do, Republic of Korea
Tel : +82-55-973-3119 / Fax : +82-70-7966-3119
kailabs@naver.com
KAI LABS CO.,LTD.